Lean Six Sigma BureauEnterprise OS
Home
ImplementationResults
Login
Verified Case Studies

6 industries. Real results. Zero guesswork.

Every case below is drawn from actual LSSB Master Black Belt certification examinations — verified project outcomes from our practitioner network. All identifying details removed.

LogisticsBB Secondment

On-Time Transportation Rate

69% → 97%
On-time performance
+28pp
Sustained improvement

Problem: Trip on-time rate at 69% — well below target. Root causes: dispatch delays, driver availability gaps, and no real-time visibility into performance.

VSMHypothesis TestSPCKaizenPareto
High-volume logistics operation · MBB secondment
LogisticsMBB Project Lead

Network Consolidation — Headcount Reduction

18 → 8
FTEs post-consolidation
56%
Headcount reduction

Problem: Two-facility workflow for priority mail processing generating significant transportation waste, excess handling, and overprocessing across 18 FTEs.

VSMFMEAHypothesis TestSPC
Multi-facility logistics network · Service quality maintained
ManufacturingMBB Secondment — 5 Sites

Multi-Site Scrap Reduction

5
Manufacturing sites
Cpk ≥1.33
Capability achieved

Problem: Scrap variation across 5 manufacturing facilities with no standardized process parameters. Each site operating independently — no shared baseline or corrective action protocol.

DOECp / CpkStandardized WorkControl PlanFMEA
Mid-market manufacturer · 5 sites · MBB-led
RetailBB Project Lead

Inventory Shrink Reduction

6.8% → ~0.8%
Shrink rate reduced 6pp
Stat. Valid.
Hypothesis test confirmed

Problem: Inventory shrink measured at 6.8% across stores — driven by theft, damage, and process losses. Root cause, identified through 5 Whys analysis, was not a process failure: it was lack of standardized training.

5 WhysParetoRegression2-Sample Hypothesis TestSOP
Multi-store retail operation · Pilot-first rollout
Pharma / HealthcareMBB Project Lead

Tablet Weight Variation — $240K Annual Savings

$240K
Annual savings — validated
DOE Opt.
Feeder speed optimized

Problem: Tablet weight variation in pharmaceutical manufacturing causing product failures and significant rework costs. Cpk analysis confirmed the process was operating outside specification. Paddle feeder speed variation identified as the key input variable.

DOECp / CpkFMEASPCFinancial ValidationGMP Control Plan
Pharmaceutical manufacturer · Regulated environment · Financial model confirmed
E-commerceBB Secondment

Peak Season Throughput Recovery

40%
Drop eliminated
>90%
Throughput sustained

Problem: Throughput dropped 40% during scheduled breaks in a high-volume fulfilment operation during peak season. Labour coverage gaps identified through heat map analysis of break timing vs. volume demand.

DOETime-Series AnalysisP-Chart (SPC)Labour Heat Map
High-volume fulfilment centre · Shift-based operation · Seasonal peak
See the Platform in Action

Ready to deploy this kind of rigour across your enterprise?

LSSB gives your CI teams the platform, curriculum, and delivery support to run projects at this standard — across sites, functions, and geographies.